2D Global Solution
Projects

Projects that work from day one.

A sample of our recent work. For confidentiality, we do not publish client names.

Paint booth mezzanine

24.8 m technical mezzanine with continuous beam, steel deck and perimeter guardrail, with full calculation report.

24.8 m≈7 tDesign + fabrication

Dust collection ductwork

Two duct runs in 10 and 12 gauge with free-standing support structure and a 15 m stack tower.

≈5.8 t15 m towerBolted on site

Modular shot-blast platform

Removable platform around the machine, with reinforced zones for 2.5 t forklifts and panels two people can lift.

250 kg/m²2.5 t forkliftModular

Transport carts

In-house product rated 1,100 and 1,500 kg with polyurethane casters, forklift pockets and a QR-traceable serial nameplate.

1,100 / 1,500 kgSerial + QRTrains of 3

Welding positioners

Semi-automatic and automatic positioners for parts up to 6,000 lb, with mesh guarding and emergency stops.

6,000 lbPneumaticSafety

Safety and plant services

Cat. 4 light curtain on a positioner, aluminum pneumatic line and anticorrosion retrofit of welding fixtures.

Type 4 / PL eCompressed airRetrofit

Your project could be next.

Tell us what you need and when.